Ultra Super VIP

Finishing Packages

Ultra Super VIP package :

8500 EGP

Works

Works Statements

1- Plumbing

BR plumbing materials, 10-year guarantee

German kesel exchange

One gibert burial box

Roca Soft Base

Burial clearing

One shower cabin.

Ideal mixers for 1 bathroom

Stainless kitchen sink.

2- Electricity

All points, TV, keys, prizes, telephone and internet circuit

Wires Certified Dr

Establishment of System Sound

24 line panel

Venus, Sass or Bchino key and prize cutter

The number of LED meters is 120 m

The number of spots is 120 m.

Number of LED profile 20m.

3- Floors

For reception and Corridors, Imported porcelain 60*120.

Provided that the price per square meter does not exceed 1000 pounds

Bathroom and kitchen walls first sorted

Provided that the price per meter does not exceed 250 pounds

Crossings (imported dark Emperador marble)

4- Insulation

Cement insulation Smart with guarantee

5- Bishop

It includes making a gypsum board for the total area of the apartment, including lighting

Green gypsum board for the reception, rooms and bathrooms

Gypsum board for kitchen

Number of meters: 140 metres.

6- Decoration

The decoration for each room and reception includes stone, wallpaper, wooden cladding, or decorative paint.

7- Carpentry doors

Turkish armored door

Interior doors are made of Musky wood with oak veneer

Aster paint

8- Paints

Sealer layer

2 cement paste knife

paste knife ready

liner

A shot

2 layers of Jotun

9- Kitchen marble

Egyptian according to customer request

10- Alumetal

Large PS sector Windows

Frosted glass for bathrooms and kitchens only.

11- Air conditioning

Establishment for the flat

The number of meters is 15 m

12- Design

For the total apartment 3D max design

13- Sound System

Supply and installation of sound system for living

14- Gift

43 inch screen

Notes:

  • Package (half finishing).
  • An additional 500 pounds per meter is added if the apartment does not have shells or shavings.
  • An additional 250 pounds is added if we receive a unit within a compound to adhere to the rules of the compound and maintain it.
  • An additional 300 pounds will be added to the price per meter if a refinishing site is received for crushing and masonry work.
  • The calculation of architectural modifications will be added according to the project engineer’s discretion.
  • The calculation of windows is added according to the number of meters, the calculation of the meter and the type.
  • The area is calculated according to the measurements and not according to the area recorded in the contract.
  • The final decorations are chosen according to the client’s taste and are agreed upon before the final finishing.

Call Us