Finishing Packages

Elite package :

11500 EGP

Works

Works Statements

1- Plumbing

2 BR plumbing materials, 10-year guarantee

Converted as a German syllable

One gibert burial box

Roca Soft Base

Burial clearing

One shower cabin.

Ideal mixers for 1 bathroom

Stainless kitchen Hance.

2- Electricity

Certified Swedey wires

Turkish Schneider or Buchino finishing

Create a remote control circuit for the reception

The number of LED meters is 170 m

Asbutat 160m

Electrical panel, 24 lines, and living.

Lead Profile Works 50 m.

3- Floors

The reception and hallway floors are imported Brescia or Emperador marble

German HDF or equivalent room flooring

Bathroom and kitchen walls first sorted

Provided that the price per meter does not exceed 275 pounds.

4- Insulation

Cement insulation Smart with guarantee

5- Bishop

It includes making a gypsum board for the total area of the apartment, including lighting

Green gypsum board for the reception, rooms and bathrooms

Gypsum board for the kitchen in the area of the apartment.

6- Decoration

The decoration for each room and reception includes stone, wallpaper, ideal marble, or decorative paint. Or wood veneer work.

7- Carpentry doors

Turkish armored door

Interior doors are made of wood, covered with oak veneer

Or imported Turkish doors ready.

8- Paints

Sealer layer

2 cement paste knife

paste knife ready

liner

A shot

2 layers of Jotun

9- Kitchen marble

Egyptian according to customer request

10- Alumetal

Large PS Windows sector

Frosted glass for bathrooms and kitchens only

Wire windows

11- Air conditioning

Establishment for the flat

The number of meters is 20 m

12- Design

3D Max

13- Sound System

Supply and installation of sound system for living

14- Smart System

-X6 lighting lines.

- X1 Air Conditioner.

- X1 TV

- X1 Receiver

- X1 Gas Detector Kit.

- X1 Smart Security Camera.

15- Gift

55 inch screen

Notes:

  • Package (half finishing).
  • An additional 500 pounds per meter is added if the apartment does not have shells or shavings.
  • An additional 250 pounds is added if we receive a unit within a compound to adhere to the rules of the compound and maintain it.
  • An additional 300 pounds will be added to the price per meter if a refinishing site is received for crushing and masonry work.
  • The calculation of architectural modifications will be added according to the project engineer’s discretion.
  • The calculation of windows is added according to the number of meters, the calculation of the meter and the type.
  • The area is calculated according to the measurements and not according to the area recorded in the contract.
  • The final decorations are chosen according to the client’s taste and are agreed upon before the final finishing.

Call Us